After a gruelling winter of extreme winds, extreme cold, and a lot of blowing snow and massive drifts, the local airport is taking steps towards managing the white stuff better next year.
New paving at the airport last year has been paying off, after two aircraft made landings there earlier this week, and were able to utilize the improved tarmac surface, says a local pilot.
$67K still needed to meet the $235K total cost of repaving runway and transfer pad BY KIM LANGEN After 15 years, the local airport is to receive a fresh layer of pavement this summer – plus much-needed paving for the